Can NETIO PowerPDU 4C switch an output on or off at a specified time?
Yes, the on/off timing of individual outputs can be configured in the “Scheduler” graphical interface.
Another option is to write a Lua script (AN07 or AN17) to switch the electrical outputs at specified dates and times.